14 Sep 2015 - {{hitsCtrl.values.hits}}
.jpg)
required Logiventures to carefully plan and load parts of the tunnel boring machine 300 meters below ground and transport it to the surface. One of the key challenges of the project was moving a 48 ton component, which, in addition to the weight, was also nearly the width of the tunnel, giving barely centimetres for the team to manoeuvre through rugged and slippery driving conditions. The use of conventional moving equipment were not an option in this project and required highly specialised equipment and ‘zero error’ precision coordination, including the use of a multi-axel trailer and multiple heavy duty pullers, currently only available through Logiventures.“The hydraulic multi-axle trailer owned by Logiventures is the first of its kind in Sri Lanka. Due to its uniqueness Logiventures has been able to assist in the transportation and relocation of many heavy weight material for many projects,” said Director of Logiventures, Janitha Jayanetti.
04 Jun 2026 2 hours ago
04 Jun 2026 2 hours ago
04 Jun 2026 3 hours ago
04 Jun 2026 3 hours ago
04 Jun 2026 3 hours ago