Havelock City Commercial Development begins piling work

28 June 2017 11:07 am

 

Havelock City – the premier integrated mixed-use development project in Sri Lanka commenced the piling works for its Commercial Development. 
The piling contract was awarded to Access Engineering PLC, one of the nation’s foremost civil engineering and construction enterprises.
The Havelock City Commercial Development comprising a 50 storeyed 600,000sqft office tower and a 200,000sqft shopping mall built to international standards at a cost of US$160 million,will be a landmark in the vicinity and transform the skyline of Colombo. Havelock City, the brain child of S. P. Tao is developed by Mireka Capital Land,a fully-owned subsidiary of Overseas Realty (Ceylon) PLC, the owner, developer and manager of the iconic World Trade Centre Colombo.
The Office Tower housing Grade ‘A’ premium office space is designed to be a LEED GOLD certified building and is built to the highest standards that enables efficient space planning through column free, wide floor plates. A smart functioning infrastructure with a computerized car park, elevator and building management systems along with the overall design and appearance facilitates businesses an unparalleled competitive advantage.
The shopping centre is developed as a community level shopping mall serving the lifestyle needs of the catchment. A miniature heaven for the ardent shopaholic, the mega mall comprises six floors of the world’s leading brands and retail stores, dining and entertainment experiences amidst a state-of-the-art multiplex cinema; a welcoming treat to anyone who craves an undivided 
shopping experience
Additionally, the two basement levels of parking with ample space to park over 900 vehicles complements the convenience and vibrancy offered by the Havelock City Commercial development.
The Commercial Development of Havelock city will be the visual anchor of the Havelock City Residencies which comprises of 8 magnificently designed apartment towers in 18 acres of prime land in Colombo. Currently Phase 3 comprising two residential towers is under construction and pre-sales 
have commenced.