Boost to hydro power
25 August 2010 02:43 pm
An engineer points at the Upper Kotmale Hydro Power Project after the completion of the excavation of a 13 kilometer long tunnel, the longest in the country, which takes water to the hydro power plant at Niyamgamdora from Talawakele.
Pics by Kushan Pathiraja