18 March 2016 08:08 am
He said 600 MW is added to the national grid with the resuming operations of the second and third stages of the Norochcholai coal power plant.
The Minister said he would inform parliament about the power outage on March 23 and that he would submit some proposals to prevent such incidents in the future. (Chaturanga Pradeep)