23 May 2018 12:01 pm
RDA Project Engineer said the vehicular movements were restricted because of the soil erosion along the Kelani River Bank connecting to the bridge.
“However, one lane is open for vehicular movements,” he said.
Meanwhile, the Police requested motorists to use alternative routes to avoid traffic. (DS)
Pix by Kushan Pathiraja
Video by Janaka Chaturanga