Cyclops Tuesday, 24 July 2012 12:47 PM
But Friday is a long way off and didn't they boast that we are the only country that gives uninterrupted power 24 hours a day?
ASHRAFF NAZIM Wednesday, 25 July 2012 05:01 AM
Still We have no hope that the Power will be resumed by Friday and if it so good for the people and the country.
Izmie Wednesday, 25 July 2012 03:28 PM
Refund the fuel charges paid by us .
M.V.R.Perera Thursday, 26 July 2012 04:59 AM
Why was it necessary to have Power cuts at all when the Engineer in charge at Norocholai Power station would have knowned that the set could be repaired tested and put on bars by friday and any water that had to be used not to have power cuts could have been made up when the 400 Mw are on bars and if there was a short fall of peaking power this could have been made good by System Control reducing voltage by 2%
xxxx Thursday, 26 July 2012 06:35 AM
Power cut was only for 2 hours a day but in Boralesgamuwa the power cut yesterday was for 3hours and 15 minutes form 3:30PM till 6:45PM again in the night from 9:15PM till 9;45 for the day 3:45 hours .. never do the things they say.. end of the day public suffer from more than 2 hours power cut.
xxxx Thursday, 26 July 2012 06:42 AM
Power cut was only for 2 hours a day but in Boralesgamuwa the power cut yesterday was for 3hours and 15 minutes form 3:30PM till 6:45PM agin in the night from 9:15PM till 9;45 for the day 3:45 hours .. never do the things they say.. end of the day public suffer from more than 2 hours power cut.
Kanga Tuesday, 21 August 2012 04:02 AM
This is the second time the main bearings have failed. This time when the HT line tripped the the Jacking oil pump did not come on. These type of failures would have been avoided if a systematic full load test was performed at the commissioning time. It was rushed through on Ministry orders and complete testing was not done. We will face more such problems f proper commissioning is not done. Hope at least the next plant will be properly commissioned with all proper tests. Time required for repairs are not known by CEB Engineers. It is left to the Chinese.
Add comment
Comments will be edited (grammar, spelling and slang) and authorized at the discretion of Daily Mirror online. The website also has the right not to publish selected comments.
Reply To:
Name - Reply Comment
The country’s health sector has recently witnessed allegations of massive c
Having passed the Sri Lanka Education Administrative Service Exam in 1988, Mr
History was made on July 26, 2023, when Sri Lanka-born Gary Anandasangaree wa
22 Sep 2023
22 Sep 2023